1 items in cart.

 13F026-00-0P

INSTANT RFQ
INSTANT RFQ
Enter List

DD101 LONG LEAD part number of Crl Components Inc - Order Now!

Part Number : DD101 LONG LEAD Manufacturer : Crl Components Inc
NSN : 5910-00-678-8157 (5910006788157)
Item Name : Capacitor Fixed Ceramic Dielectr CAGE Code : 71590
NIIN : 00-678-8157  (006788157)
FSC Code : 5910 Capacitors
FSG Code : 59 Electrical and Electronic Equipment Components
INC Code : 00007
NCB Code : 00 Country : USA

Thank you for taking an interest in part number DD101 LONG LEAD, that of which is listed with the description Capacitor Fixed Ceramic Dielectr; Manufactured by Crl Components Inc and listed alongside the NSN 5910006788157, part number DD101 LONG LEAD is available for immediate purchase on our website. As such, to learn more about this offering while receiving a competitive quote for your comparisons, be sure to fill out and submit the RFQ form presented on this page. Within 15 minutes of us receiving and reviewing a completed form, a member of our staff will contact you to present a tailored solution for your comparisons.

Recently Viewed Parts
KMH035VN822M30
RFQ
3SL782
RFQ

DD101 LONG LEAD part number of Crl Components Inc - Order Now!

Part Number : DD101 LONG LEAD Manufacturer : Crl Components Inc
NSN Number : 5910-00-678-8157 (5910006788157)
Item Name : Capacitor Fixed Ceramic Dielectr CAGE Code : 71590
NIIN : 006788157
FSC CODE : 5910 Capacitors

Thank you for taking an interest in part number DD101 LONG LEAD, that of which is listed with the description Capacitor Fixed Ceramic Dielectr; Manufactured by Crl Components Inc and listed alongside the NSN 5910006788157, part number DD101 LONG LEAD is available for immediate purchase on our website. As such, to learn more about this offering while receiving a competitive quote for your comparisons, be sure to fill out and submit the RFQ form presented on this page. Within 15 minutes of us receiving and reviewing a completed form, a member of our staff will contact you to present a tailored solution for your comparisons.

Request a Quote for Part Number DD101 LONG LEAD

Request a Quote

“*” Required Fields

Contact Information

Note: We Will Not Share Your Information With Any Third Parties.
   * All quotes / sales are subject to ASAP Semiconductor's
Terms and Conditions
  • I consent to receive email communications from ASAP Semiconductor and can unsubscribe at any time.
  • ASAP Semiconductor is a wholly independent aftermarket parts distributor.
  • This website is intended for quotations based on part numbers only. Please DO NOT submit drawings, technical data, or other specifications through this portal.

Disclaimer: This is a quotation for the goods listed above. This quotation is meant as an estimate and does not reflect a final bill or invoice. All quotations are subject to change until acceptance by ASAP Semiconductor of a binding Purchase Order, and quotations may be withdrawn or revised at the sole discretion of ASAP Semiconductor. This quotation is subject to the ASAP Semiconductor Terms & Conditions available at https://www.asapsemi.com/customer-terms-conditions/. All United States Government and Department of Defense bids are quoted as CAGE code 6RE77 from ASAP Semiconductor’s Anaheim, California facility. Any quotation from ASAP Semiconductor without CAGE code 6RE77 is void.

NSN Information for Part Number DD101 LONG LEAD with NSN 5910-00-678-8157, 5910006788157

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-678-8157

Item PartTypeName:

CAPACITOR,FIXED,CERAMIC DIELECTR

59100067881570P
CIICHCCESDPMICCriticalityENAC
UA0
Part NumberISCRNVCRNCCHCCMSDSSADC
064-064395

Characteristics Data of NSN 5910-00-678-8157, 5910006788157

MRCCriteriaCharacteristic
AAQLBODY STYLEW/O MTG FACILITIES,RADIAL TERMINALS
AARGRELIABILITY INDICATORNOT ESTABLISHED
ABJTTERMINAL LENGTH1.500 INCHES MINIMUM
ABKWUNABLE TO DECODEUNABLE TO DECODE
ABMKUNABLE TO DECODEUNABLE TO DECODE
ABPMBODY DIAMETER0.290 INCHES MAXIMUM
ADAQBODY LENGTH0.156 INCHES MAXIMUM
AEBSCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER0.250 INCHES NOMINAL
AEBTTERMINAL DIAMETER0.025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODE(S)
AGAVEND ITEM IDENTIFICATIONMISSILE,AITOAIR,PHOEBNIX (AIM54); TELETYPE,MODEL 28; TEST CONSOLES,MINISACE; ENGINE,AIRCRAFT TF33PW102 (C135E,EC135H/K/P); MISSILE,AIRTOAIR,SPARROW (AIM7); SUPPORT EQUIPMENT,MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT,B
CQBQCAPACITANCE VALUE PER SECTION100.000 PICOFARADS SINGLE SECTION
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE-56.0/22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION
CQJJNONDERATED OPERATING TEMP-55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION1000.0 DC SINGLE SECTION
CRTLCRITICALITY CODE JUSTIFICATIONFEAT
CRTPTOLERANCE RANGE PER SECTION-10.00 TO 10.00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP10000.0 MEGOHMS
CWSGTERMINAL SURFACE TREATMENTSOLDER
FEATSPECIAL FEATURESWEAPON SYSTEM ESSENTIAL
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD

Frequently Asked Questions (FAQ): DD101 LONG LEAD NSN Part

What Type of Item Is Part Number DD101 LONG LEAD?
  • Part Number DD101 LONG LEAD is an "Capacitor Fixed Ceramic Dielectr" manufactured by Crl Components Inc Managed with the NSN 5910-00-678-8157. This part number is available for immediate purchase on our website, so do not hesitate to kick off purchasing today.
How Do I Request a Quote for Part Number DD101 LONG LEAD?
  • Capacitor Fixed Ceramic Dielectr To receive a competitive quote for items with the part number DD101 LONG LEAD, simply fill out and submit the RFQ form provided on this page, being sure to include details such as your desired quantity, target price, and expected delivery date. We also ask that you provide us your name, email, and phone number so that we can deliver purchasing options promptly.
Why Is CAGE Code 71590 Important When Purchasing Part Number DD101 LONG LEAD?
  • CAGE Code 71590 signifies Crl Components Inc Managed as the manufacturer of Part Number DD101 LONG LEAD, ensuring that you only procure exactly what you require while having information on the exact facility the item traces back to.
Why Is NSN 5910-00-678-8157 Paired with Part Number DD101 LONG LEAD?
  • Part Number DD101 LONG LEAD is the identification assigned to the item by Crl Components Inc Managed, serving as an easy form of identification for the company’s supplied items. On the other hand, NSN 5910-00-678-8157 is a NATO-recognized code assigned to this item based on its design and use, serving as an identifier that may also be used for other manufacturers producing the same form of product. As such, utilizing both part number and NSN data ensures that you can locate and procure exact requirements.

Semiconductor’s Certifications and Memberships

Thank You for Visiting!

We hope that you will visit us again the next time you need board-level components, aviation and aerospace parts, and more. Allow us to serve as your strategic purchasing partner.

Request for Quote

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.

top up